- Minimum self-recoating interval – 15 min at 20°C. Approximately – after 40 min, a PU topcoat can be applied.
- Total DFT can be built up in multiple layers.
- Can be used in various production conditions. Effective curing at low temperatures down to -10°C.
- No induction time, which speeds up the work process.
TRIOCOAT MASTIC 4700 — Technical Data Sheet
Epoxy primer. Two-component epoxy primer containing anti-corrosion pigments.
MATERIAL DESCRIPTION
Two-component epoxy primer containing anti-corrosion pigments.
COATING PURPOSE
A universal anti-corrosion solution for the manufacture of process and electrical equipment, in general industrial and transport engineering, where resistance to extreme operating conditions is required. The primer is especially effective in combination with topcoats, ensuring a long service life even in aggressive environments. The primer is used for the protection of both new and repaired equipment made of carbon, stainless and galvanized steel, and aluminium. Not for use under immersion. Operating temperature of the primer coating: from minus 60 to plus 120 °C.
PHYSICAL CHARACTERISTICS
Coating thickness:
Recommended minimum thickness of one dry film layer of TRIOCOAT MASTIC 4700: 50 µm. Recommended number of coats — 1–3. Non-sagging layer thickness (WFT): not less than 250 µm.
Theoretical consumption:
Theoretical consumption of the primer when applied by pneumatic spraying to obtain a coating with DFT = (50–150) µm is (119–360) g/m².
Drying time of the coating with DFT = (50–150) µm:
| Drying temperature | (12±2) °C | (20±2) °C | (60±2) °C |
|---|---|---|---|
| Relative air humidity | (75±5) % | (65±5) % | — |
| Drying to degree 3, according to GOST 19007, not less | 6 h | 4 h | 0.5 h |
| Drying to resistance to mechanical impact (stacking, assembly) | 14 h | 8 h | — |
| Full drying to resistance to mechanical and chemical impacts (before operation of the product) | 14 days | 7 days | 1 h |
When assessing and calculating the actual drying time, it is necessary to take into account the presence of air flows and relative air humidity.
SURFACE PREPARATION
The surface to be painted must be dry and clean. The material is applied to a prepared and dry surface with a temperature at least 3 °C above the dew point. The preparation process includes the following operations: elimination of surface defects to grade P3 according to ISO 8501-3; degreasing of the surface (if necessary); surface cleaning to grade Sa 2.5 according to GOST R ISO 8501-1. Recommended roughness profile Rz (20–50) µm. Dust removal of the surface to degree 2 with a particle size of not more than class 2 according to ISO 8502-3. The primer must be applied immediately after cleaning of the surface to be coated.
APPLICATION
Material preparation:
The material is two-component; before application, the base and the hardener must be mixed separately. The mixing ratio of the base and hardener to obtain a ready-to-apply mixture is 9.8 : 1 by volume (14.7 : 1 by weight).
Process parameters:
| Application method | Working viscosity, s | Amount of thinner, % | Pressure, atm | Nozzle diameter |
|---|---|---|---|---|
| Brush, roller | — | 0.5 | — | — |
| Pneumatic spraying | 35–70 | 0–25 | 2–3 | 1.8–2.2 mm |
| Airless spraying | 50–70 | 0–10 | 160–200 | 0.015–0.020 inch |
(In closed rooms, provide supply-and-exhaust ventilation in the appropriate volume for the period of application and drying.)
RECOMMENDED SYSTEMS
STORAGE
24 months from the date of manufacture. It is recommended to store in a dry dark place in sealed factory packaging at a temperature from 0 to plus 30 °C, avoiding direct exposure to UV rays and other heat sources.
TRANSPORT PACKAGING
Kit "base — hardener" — 20 l.
HEALTH AND SAFETY
Refer to the Safety Data Sheet for the material.
TRIOCOAT MASTIC 4700 — Application Manual
Epoxy primer. Product description: see Technical Data Sheet for TRIOCOAT MASTIC 4700.
CONTENTS
The instruction provides guidance on surface preparation; material preparation for application; the application process and equipment used; storage conditions; safety precautions; fire safety measures; environmental protection; first aid measures.
SURFACE PREPARATION
The material is applied to a prepared and dry surface with a temperature at least 3 °C above the dew point. The preparation process includes the following operations: elimination of surface defects to P3 according to ISO 8501-3; degreasing of the surface (if necessary); surface cleaning:
- carbon steel — to grade Sa 2.5 according to GOST R ISO 8501-1;
- stainless steel — abrasive blast cleaning with a non-metallic abrasive, sharp profile;
- aluminium — abrasive blast cleaning with a non-metallic abrasive, sharp profile;
- galvanized steel — light abrasive blast cleaning with a non-metallic abrasive to a clean roughened surface.
Recommended roughness profile Rz (20–50) µm. Dust removal of the surface to degree 2 with a particle size of not more than class 2 according to ISO 8502-3.
The material is applied to a dry, clean surface after its preparation. The interval between surface preparation and material application is determined by environmental conditions and the manufacturer's recommendations. In case of direct exposure to atmospheric precipitation, it is necessary to wait for the surface to dry completely and repeat the surface preparation procedure.
MATERIAL PREPARATION
TRIOCOAT MASTIC 4700 is a two-component epoxy primer containing anti-corrosion pigments, with a volume solids content of 58–63 %. If dilution is necessary, use thinner TRIOSOLV 0002.
The material is supplied in euro pails: base — hardener kit, 20 l.
After opening the container, before application, the base and the hardener must be mixed separately. The ratio of base to hardener to obtain a ready-to-apply mixture is 9.8 : 1 by volume (14.7 : 1 by weight).
When mixing the two components, stir the mixture thoroughly throughout the entire volume until a homogeneous liquid of uniform color is obtained, then hold before application for 2–3 minutes. For coating classes 4 and higher, before use, filter the mixture of base and hardener through a sieve with mesh 01 or 02 according to GOST 6613, or a similar sieve, or a synthetic fabric mesh (nylon, polyamide, polyester) with a nominal aperture size from 100 to 200 µm according to GOST 4403.
APPLICATION
Process parameters
| Application method | Thinner, % by volume | Thinner, % by weight | Pressure, atm | Nozzle diameter |
|---|---|---|---|---|
| Brush, roller | 0–16 | 0–10 | — | — |
| Pneumatic spraying | 0–47 | 0–30 | 2–3 | 1.8–2.2 mm |
| Airless spraying | 0–16 | 0–10 | 160–200 | 0.015–0.020" |
Recommended application conditions
- air temperature not lower than minus 10 °C;
- relative air humidity not higher than 80 %;
- temperature of the surface to be painted at least 3 °C above the dew point;
- absence of direct atmospheric precipitation.
Control parameters before shift
Before the start of each work shift, it is recommended to check and record the following parameters:
- environmental conditions (air temperature, relative humidity);
- dew point temperature;
- surface temperature;
- absence of moisture and oil contamination on the surface;
- absence of dust on the surface.
Equipment preparation
Before applying the material by pneumatic or airless spraying, pass a solvent through the spray equipment to clean it from previously used paints and coatings. The solvent depends directly on the type of materials used earlier. Equipment cleaning is also recommended at the end of the work shift.
Without dilution, the minimum wet film thickness (WFT) of one coat of material is 82 µm, which corresponds to a dry film thickness (DFT) of 50 µm; the maximum WFT of one coat is 250 µm, which corresponds to a DFT of 150 µm.
DRYING TIME
Table 1 — Drying time at DFT (50–150) µm
| Parameter | (12±2) °C (75±5) % |
(20±2) °C (65±5) % |
(60±2) °C | (80±2) °C |
|---|---|---|---|---|
| Drying to degree 3 (GOST 19007), not less | 6 h | 4 h | 0.5 h * | 20 min * |
| Drying to resistance to mechanical impact (stacking, assembly) | 14 h | 8 h | Holding at plus (20±2) °C — 1 h | Holding at plus (20±2) °C — 1 h |
| Full drying to resistance to mechanical and chemical impacts (before operation of the product) | 14 days | 7 days | Holding at plus (20±2) °C — 1 h | Holding at plus (20±2) °C — 1 h |
Note: * — before accelerated drying, the coating must be held in open air for 15 minutes.
When assessing the actual drying time, it is also necessary to take into account the presence of air flows and relative air humidity.
WET FILM THICKNESS CONTROL
Wet film thickness is controlled with a "comb" gauge using the last tooth touching the paint. Above each tooth of the comb, its gap value in microns from the "base" teeth (from 0) is marked.
When performing measurements, the comb must be installed perpendicular to the plane of the painted surface. After each measurement, the surface of the comb in contact with the paint must be thoroughly wiped with a clean cloth.
The wet film thickness of the coating must be recorded.
QUALITY CONTROL OF THE FINISHED COATING
Quality control of the finished coating is performed according to the following characteristics:
- appearance (no sags, cracking, peeling, etc.) — a uniform grey coating;
- dry film thickness is determined by the 80–20 rule: 80 % of the measured thicknesses must be not less than the thickness specified in the specification (nominal thickness); 20 % of the measured thicknesses must be not less than 80 % of the nominal thickness.
To measure the dry film thickness of coatings, it is recommended to use thickness gauges with a measuring range from 0 to 5000 µm.
STORAGE
It is recommended to store the epoxy primer TRIOCOAT MASTIC 4700 in a well-ventilated dry room at a temperature from 0 to plus 30 °C in sealed factory packaging, indoors, avoiding direct exposure to UV rays.
The shelf life of the epoxy primer TRIOCOAT MASTIC 4700 is 24 months subject to storage conditions. The material should be used within the shelf life recommended by the manufacturer. The decision on the use of material with a shelf life of more than 24 months is taken by a commission.
SAFETY PRECAUTIONS
General provisions
During work, the requirements of GOST 12.3.002, GOST 12.3.005, GOST R 12.3.052 must be observed. Hazardous and harmful production factors must be eliminated or reduced to acceptable levels. When organizing and performing painting work, physiologically justified work and rest regimes should be provided.
Personnel requirements
Persons not younger than 18 years of age who have completed the following are allowed to perform anti-corrosion works:
- occupational safety training — according to Decree of the Government of the Russian Federation No. 2464 of 24 December 2021, industrial sanitation, fire and electrical safety;
- vocational training.
Officials, in accordance with the requirements of SNiP 12-03 and SNiP 12-04, are responsible for compliance with labour protection and industrial safety requirements during work.
Workers must know:
- hazardous and harmful production factors, harmful substances in the composition of the materials used in the air of the working zone and the nature of their effect on the human body;
- instructions on the procedure for performing work and maintaining the workplace;
- instructions on labour protection, fire safety, industrial sanitation;
- personal hygiene rules;
- rules for the use of personal protective equipment (PPE);
- rules for providing first aid.
Safety requirements for surface preparation and painting
All work related to the use of paints and coatings in rooms must be carried out with operating general supply-and-exhaust and local exhaust ventilation according to GOST 12.4.021. Ventilation must ensure that the content of harmful substances in the air of the working zone does not exceed the maximum permissible concentrations in accordance with the requirements of GOST 12.1.005, SanPiN 1.2.3685.
Workers engaged in surface degreasing, preparation and application of paints and coatings must be provided with the following PPE:
- protective painting suits, disposable or reusable, with a zipper running along the length of the garment for ease of putting on and taking off, elastic bands at the wrists, ankles and waist, and a hood;
- technical rubber gloves according to GOST 20010;
- safety glasses according to GOST 12.4.253 (EN 166:2002), symbol 3, or equivalent with the same functional purpose;
- filtering respirators with an insulating face piece in the form of a half-mask according to GOST 12.4.296 with a combined RPE filter providing simultaneous protection against gases, vapours and aerosols according to GOST 12.4.235 AZRZ (brown-white), AKhRZ or equivalent with the same functional purpose;
- footwear made of leather, with a hard toe to avoid injury to the feet in case of falling heavy objects; the sole is protected by a metal plate.
Storage of organic solvents at the workplace is allowed in hermetically sealed containers in an amount not exceeding the two-shift norm.
When working with solvents, observe the following safety requirements: use respiratory and eye PPE; work with the ventilation system turned on, providing air exchange at the required rate.
During surface preparation, the sandblaster must work in special clothing made of dust-proof fabric and a helmet of the MIOT-49 type, and use PRB-5 respirators with forced air supply.
Rules for handling toxic substances
The epoxy primer TRIOCOAT MASTIC 4700 is manufactured in accordance with TU 20.30.12-298-40141638-2025. It is a universal anti-corrosion solution for the manufacture of process and electrical equipment, in general industrial and transport engineering, where resistance to extreme operating conditions is required. The primer is especially effective in combination with topcoats, ensuring a long service life even in aggressive environments. The primer is used for the protection of both new and repaired equipment made of carbon, stainless and galvanized steel, and aluminium. Not for use under immersion.
The container in which the epoxy primer TRIOCOAT MASTIC 4700 is located must have a label with the exact name and designation of the material contained in it. The container must be intact and have a tightly closing lid.
In case of accidental spillage of paint, cover the spill area with sawdust or sand, having previously protected the respiratory organs. Contaminated solvents, sawdust, sand, rags, cloths should be collected in buckets and removed to specially designated places in accordance with the requirements of GOST 30772, GOST R 52107.
Eating and smoking is allowed only in specially designated places.
FIRE SAFETY MEASURES
Fire safety measures during painting work must be carried out in accordance with the Technical Regulation on Fire Safety Requirements (No. 123-FZ of 22 July 2008) and other regulatory documents.
The paints and coatings used are classified as flammable materials; therefore, fire safety measures are taken at the workplace in accordance with the requirements of GOST 12.1.004 and Decree of the Government of the Russian Federation No. 1479 of 16.09.2020 "On Approval of the Fire Regime Rules in the Russian Federation".
When performing surface preparation for painting and painting works, it is not allowed to:
- smoke, light fires, or carry out welding works within a radius of 25 m from the work site, as well as along the entire vertical in this zone;
- heat production rooms and protected objects with electrical appliances of standard design.
In the event of a fire, people should be evacuated from the danger zone, the fire service should be notified, paints and coatings should be removed from the work zone, and fire extinguishing should be started with the available means in strict accordance with the approved plan.
ENVIRONMENTAL PROTECTION
During painting work, solid and liquid wastes are generated.
Table 2 — Waste and disposal methods
| Waste name | Waste disposal method |
|---|---|
| Solid waste: material container — euro pails | Dispose of containers as household waste. Euro pails can be used for technical purposes after the material has dried on the inner walls. |
| Liquid waste: solvent/cleaner for flushing painting equipment; material residues | Disposed of by the work manufacturer in accordance with GOST 30772, GOST R 52107. |
FIRST AID MEASURES
General: if poisoning is suspected, seek medical help.
In case of inhalation: if the product is inhaled, move the victim to fresh air, ensure rest and seek medical help.
In case of contact with eyes: if the product gets into the eyes, rinse them with plenty of clean running water and seek medical help.
In case of contact with skin: if the product gets on the skin, remove contaminated clothing and wash the contact area thoroughly with soap and water. The use of solvents or thinners is prohibited. If the product enters the body with food, ensure rest for the victim and immediately seek medical help.
You may also be interested in
TRIOCOAT™ HS 4711. Epoxy Coating
Two-component high-molecular-weight epoxy coating.
Application temperature : -10°С/+35°С
Color : Gray , Red‑brown
TRIOCOAT™ RVS 9710. Standalone Coating
Epoxy-phenolic two-component material
Application temperature : +5°С/+40°С
Color : Gray , Red
TRIOCOAT™ EPOXY 2700
Two-component epoxy primer-enamel containing anti-corrosion pigments.
Color : RAL color matching
Any questions?
Please contact us.