Infrastructure

Infrastructure

Infrastructure and civil facilities—from bridges, ports, and transport interchanges to modern stadiums, airports, and logistics hubs—face extreme operational demands every day. 

Harsh weather conditions, chemical exposure, constant vibrations, and the critical need to ensure uninterrupted operation for decades. For high-occupancy public venues, impeccable aesthetics and strict adherence to safety regulations are equally critical. There is zero margin for error in this sector: premature material degradation leads to massive financial losses, forced downtime, and direct threats to human life.

Certified systems for the "Infrastructure"

Filters
Select by:
Protection type
Surface type
Fire resistance limit
Fire type
Environmental corrosivity
Service life
Operating temperature

Selected: 0

  • cellulosic fire

Fire protection system for metallic structures based on solvent-borne acrylic intumescent fire protection compound

Get offer
1 layer TRIOCOR Mastic 4500
2 layer TRIOFLAME AK 7700
3 layer TRIOCOR Finish 5500
  • 7-15 years
  • -40°С / +70°С
  • cellulosic fire

Water-based acrylic thermoexpanding fire protection system for steel structures

Get offer
1 layer TRIOCOR Primer 1100
2 layerTRIOFLAME AK 7000
3 layer TRIOCOR Finish 5100
  • 7-15 years
  • -40°С / +70°С
  • cellulosic fire

Fire protection system for steel structures based on solvent-borne acrylic intumescent compound

Get offer
1 layer TRIOCOR Mastic 4500
2 layer TRIOFLAME AK 7700
3 layer TRIOCOR Finish 5500

  • > 25 years
  • -60°С / +70°С
  • cellulosic fire

Solvent based two-component weather-resistant fire-protective system coating for steel structures

Get offer
1 layer TRIOCOR Mastic 4500
2 layer TRIOFLAME 8800
3 layer TRIOCOR Finish 5500

References

View all

RMK-Arena, Chelyabinsk

Materials:

  • TRIOCOR™ MASTIC 4500
  • TRIOFLAME™ 8800
  • TRIOCOR™ FINISH 5500

Cultural Center, Novy Urengoy

Materials:

  • TRIOCOR™ MASTIC 4500
  • TRIOCOR™ FINISH 5500
  • TRIOFLAME™ 8800
  • TRIOTHERM™ 3500

Construction of CHROMPIK plant for production of chromium compounds

Materials:

  • TRIOCOR™ MASTIC 4500
  • TRIOCOR™ FINISH 5500
  • TRIOFLAME™ 8800
  • TRIOTHERM™ 3500

Construction of Peterburgsky sports complex

Materials:

  • TRIOCOR™ FINISH 5500
  • TRIOFLAME™ 8800

Polyplast Novomoskovsk

Materials:

  • TRIOCOR™ MASTIC 4500
  • TRIOCOR™ FINISH 5500
  • TRIOFLAME™ 8800
  • TRIOTHERM™ 3500

Mordovia Arena Stadium at Saransk

Materials:

  • TRIOFLAME™ AK 7700

Construction of a vocational training center. PJSC “UEC-UMPO”

Materials:

  • TRIOCOR™ PRIMER 1100
  • TRIOCOR™ FINISH 5100

Please contact us – we will select the coverage

Please fill out short form and we will get back to you.

By staying on the site, you agree to the processing of cookies and user data for the purpose of the site's operation.. More

Ok