2022-2023

Construction of Vladivostok HPP-2

Corrosion Protection and Fire Protection

Replaces the 70-year-old TPP-1. Capacity 410 MW, thermal — 1,389.8 Gcal/h. Combined cycle technology, all equipment is Russian. Construction was completed 2 years ahead of schedule. Boilers withstand wind of 60 m/s (fighter jet speed).


Products:
  • TRIOCOR™ MASTIC 4500
  • TRIOFLAME™ АК 7700
  • TRIOTHERM™ 3500
  • TRIOCOR™ FINISH 5500
Coverage:
40,000 m²

Asset Owner:
PJSC RusHydro

#Power Generation