2019-2021
Construction of an overpass and a transport interchange at different levels at the intersection of the railway in the area of PMK-9, Novy Urengoy
Corrosion Protection
The largest multi-level interchange in Yamal with 13 exits. Structure length — 5.9 km. Under the asphalt — a system of pipes pumping cold air so that the road does not turn into a skating rink due to permafrost heat.
Products:
- TRIOCOR™ ZINC 1700
- TRIOCOR™ MASTIC 4500
- TRIOCOR™ FINISH 5500
Coverage:
112,530 m²
Asset Owner:
JSC Mostostroy-11
#Machinery and Equipment