2019-2021

Construction of an overpass and a transport interchange at different levels at the intersection of the railway in the area of PMK-9, Novy Urengoy

Corrosion Protection

The largest multi-level interchange in Yamal with 13 exits. Structure length — 5.9 km. Under the asphalt — a system of pipes pumping cold air so that the road does not turn into a skating rink due to permafrost heat.


Products:

  • TRIOCOR™ ZINC 1700
  • TRIOCOR™ MASTIC 4500
  • TRIOCOR™ FINISH 5500


Coverage:
112,530 m²

Asset Owner:
JSC Mostostroy-11
#Machinery and Equipment