2021

Construction of a bridge over the Agan River

Corrosion Protection

Length 390 m. The longest bridge repaired in Yugra in 2024. Supports are driven to a depth of 40 m — below the bed of the ancient river.


Products:

  • TRIOCOR™ MASTIC 4500
  • TRIOCOR™ FINISH 5500


Coverage:
15,000 m²

Asset Owner: 
JSC Stroytransgaz


#Machinery and Equipment

By staying on the site, you agree to the processing of cookies and user data for the purpose of the site's operation.. More

Ok