2017
Construction of a double-track electrified section of Zhuravka-Bochenkovo. Railroad bridge
Anti-corrosion Protection
A key link in the new strategic railway corridor. The double-track bridge is designed for extreme dynamic loads from high-speed heavy freight trains.
Coatings:
- TRIOCOR™ ZINC 1700
- TRIOCOR™ MASTIC 4500
- TRIOCOR™ FINISH 5500
Coverage area:
20 000 m²
Asset Owner:
JSC "RZD"
#Machinery and Equipment