2017

Construction of a double-track electrified section of Zhuravka-Bochenkovo. Railroad bridge

Anti-corrosion Protection

A key link in the new strategic railway corridor. The double-track bridge is designed for extreme dynamic loads from high-speed heavy freight trains.


Coatings:
  • TRIOCOR™ ZINC 1700
  • TRIOCOR™ MASTIC 4500
  • TRIOCOR™ FINISH 5500

Coverage area:
20 000 m²

Asset Owner:
JSC "RZD"
#Machinery and Equipment

By staying on the site, you agree to the processing of cookies and user data for the purpose of the site's operation.. More

Ok