2016-2019

Sakhalin TPP-2. The first stage of construction

Corrosion Protection and Fire Protection

Replaced the 1965 station. Capacity 120 MW. Unique "dry" cooling tower 65 m high — no analogues in Russia (no water losses). Electrostatic precipitators capture 99.6% of ash particles.


Products:
  • TRIOCOR™ PRIMER 1100
  • TRIOFLAME™ АК 7700
  • TRIOFLAME™ KONSTRUKTIV AK 7111
  • TRIOFLAME™ EP 8800
  • TRIOTHERM™ 3500+TRIOFLAME™ EP 8800
  • TRIOCOR™ FINISH 5500
Coverage:
467,000 m²

Asset Owner:
JSC RusHydro
#Power Generation