2021

Repair of the bridge over the Ob River in Barnaul

Unique "sandwich" bridge: combined railway + highway. One of the three two-level bridges in Russia. Built in 1915 (railway) and 1959 (highway). Total length 1.29 km. Repair cost — 934 million rubles.


Products:

  • TRIOCOR™ MASTIC 4500
  • TRIOCOR™ FINISH 5500


Coverage:
10,000 m²

Asset Owner: 

KGKU Altayavtodor

#Machinery and Equipment

By staying on the site, you agree to the processing of cookies and user data for the purpose of the site's operation.. More

Ok