Ensuring the needs of Amur Gas Processing Plant. Amur Thermal Power Plant

  • Ensuring   the needs of Amur Gas Processing Plant. Amur Thermal Power Plant
2019 
Corrosion Protection and Fire Protection     

Products

TRIOCOR™ MASTIC 4500, TRIOFLAME™ AK 7700, TRIOTHERM™ 3700+TRIOFLAME™ AK 7700, TRIOCOR™ FINISH 5500


List of Works: 
  • Fire protection design
  • Supply of materials
  • Application of fire protection and corrosion protection materials
Coverage:  
40,000 m²  

Asset Owner:  
LLC Gazprom Pererabotka Blagoveshchensk 

General Contractor: 

JSC TEK Mosenergo 

General Designer:
JSK Institute Teploelectroproject

Contractor:
LLC GEH Engineering

Subcontractor:

JSC O3-Engineering